Our
team prides themselves on being able to design, fabricate, and deliver
the best tools for a customer's situation. All of our Senior Designers
have over 15 years experience in successfully designing tools for the
nuclear industry. One of our designers was a Senior Vice-president of
Engineering for a Westinghouse subsidiary. He alone holds 17 patents on
industry related machines and tooling.
Why do we think we are the best choice for designing your
tool? Many of our designers have gone to sites and worked in containment
with these tools. Our designers understand the special requirements of
a tool in containment. Ask your current or next designer some of these
questions:
|
How
hard is it to remove a #10 screw while wearing 2 pairs of gloves?
|
|
What about when
you have to safety wire that screw? |
|
What does "ALARA"
stand for? |
|
What
does an HP say when fuel pool water drains out of a tool onto the
floor? |
|
How
can we make it easier to operate this tool while watching it from
a camera? |
|
Do radiation
levels merit a quick mounting design? |
|
Should the vertical
pipes supporting a work platform be water tight? |
|
How many hoses
going over the pool side are too many? |
|
Why waste money
color coding cables and hose connections? |
|
Should we worry
about crud traps and decon? |
Customers don't like surprises when a tool arrives on site.
Let us engineer the problem away before it happens. When you talk to our
designers about your project you will realize how far we plan ahead.
|